|
Pinecone Creek captures a drainage area of approximately 21.9 square
kilometres. The project design flow of 5.7 cumecs would produce
approximately 88,000 MWh of green energy per annum.
The project
consists of an intake at 785m which feeds a 3,478m penstock, with 655m
of head delivering enough water pressure to drive a 29 MW plant
capacity.
|