|
Shale Creek captures a drainage area of approximately 15.3 square
kilometres. The project design flow of 3.5 cumecs would produce
approximately 52,000 MWh of green energy per annum.
The project
consists of an intake at 844m which feeds a 3,558m penstock, with 604m
of head delivering enough water pressure to drive a 16 MW plant
capacity.
|