Steve Creek captures a drainage area of approximately 11.4 square
kilometres. The project design flow of 2.5 cumecs would produce
approximately 45,000 MWh of green energy per annum.
The project
consists of an intake at 1010m which feeds a 3,600m penstock, with 850m
of head delivering enough water pressure to drive a 16 MW plant
capacity.
|